Garage Door Replacement Program:

Program Description: Existing Masonite garage doors will be removed and replaced with white, raised panel, steel garage doors, no windows.

 

           2006  Program Schedule:                    # of Homes

- Carpenter Lane                                        9

- Brighton Woods Road – Lower             9

- Lamplighter Circle                                    10

- Chandler Place                                        10

- Peddler Place                                             4

                            Total              42

2007  Program Schedule:                    # of Homes

    - Squire Circle                                           13

   - Cobbler Circle                                        12

    - Brighton Woods Road - Upper            5

    - Bookbinder Circle                                 11

                                   Total          41

 

Road/Driveways Refurbishing:

Program Description:   Existing loose gravel will be removed down to tar/chip surface. Low areas will be filled and a 1-1/2" wearing surface of asphalt will be applied to all driveways, roadways and visitor parking areas.

 

2008

Program Schedule:        # of Homes

- Brighton Woods Rd – Upper    5

- Bookbinder Circle                     11

- Carpenter Lane                         _9

                                      Total        25

2009

Program Schedule:        # of Homes

- Brighton Woods Rd - Lower      9

- Lamplighter Circle                       10

- Chandler Place                            10

    Total     29

2010

Program Schedule:        # of Homes

- Squire Circle                           13

- Peddler Place                           4

- Cobbler Circle                        12

 Total        29

 